Skip to main content

map

map

LEGEND:

Project Marker Project

Project With Road Closure Project with

       ROAD CLOSURE

Back to projectsBack to Projects

TAYLOR HIGHWAY NEW WAYSIDES ROAD CONSTRUCTION through the season
What You Need to Know
  • Expect PILOT CAR operations, flagging operations, construction crews and equipment on roadway Monday through Saturday from 7:00am to 8:00pm. Drivers can expect DELAYS up to 20 minutes. 
Traffic Impacts

Be alert to construction crews on roadway. Please use caution when driving construction zone. 

Project End Result

The Alaska Department of Transportation is working to construct two new waysides at MP 84 and Mosquito Fork Dredge Trailhead at MP 68.1 of the Taylor Highway.

Contractor Information

HC Contractors

Contractor Number
907-388-1073

Special Accommodations Contact:

Those people who reside in construction zones and may require special accommodations should call the DOT Highway Construction Engineer at 907-269-0450 (TTY 907-269-0473).

Safety in all construction zones:

  • Traffic fines are double
  • Watch for changing driving surfaces
  • Watch for reduced speed limits
  • Be alert to and follow directions of flaggers
  • Drive with headlights on
  • Allow additional time when traveling
  • Watch for equipment and workers