STERLING HIGHWAY, MP 89.8 LEFT TURN LANES ROAD CONSTRUCTION through October
What You Need to Know
  • Drivers should be aware of milling and paving operations.
  • Drivers should expect traffic control from 8:00pm to 6:00am nightly.
  • Drivers should be aware that asphalt may be a milled surface; motorcyclists should use extreme caution.
  • Please be aware that there may not be a useable shoulder throughout the project.
Traffic Impacts

Drivers should expect flagging operations, PILOT CARS and short DELAYS. Please plan your route accordingly and be alert to workers and equipment in the area.

Project End Result

The Alaska Department of Transportation and in partnership with Wolverine Supply, Inc. the project will add left turn lanes to Forest Lane and Jim Dahler Road. The shoulders will be brought up to standard, and drainage and site distance will be improved. New highway lighting will be installed to increase safety in the corridor. This season's work will consist of highway lighting work, embankment construction, paving and signing and striping.

Contractor Information

Wolverine Supply, Inc.

Contractor Number
907-373-6572
DOT Number
907-269-0450

Special Accommodations Contact:

Those people who reside in construction zones and may require special accommodations should call the DOT Highway Construction Engineer at 907-269-0450 (TTY 907-269-0473).

Safety in all construction zones:

  • Traffic fines are double
  • Watch for changing driving surfaces
  • Watch for reduced speed limits
  • Be alert to and follow directions of flaggers
  • Drive with headlights on
  • Allow additional time when traveling
  • Watch for equipment and workers