Skip to main content

map

map

LEGEND:

Project Marker Project

Project With Road Closure Project with

       ROAD CLOSURE

STERLING HIGHWAY MP 45 to 60, SUNRISE LAKE ROAD to SKILAK LAKE ROAD, ADVANCED CLEARING ROAD CONSTRUCTION through the season
What You Need to Know
  • Drivers should be aware of trucks exiting and entering the roadway at Juneau Creek and Bean Creek Road.
Project End Result

The Alaska Department of Transportation, in cooperation with Kiewit Infrastructure West Co., is performing preliminary land clearing activities required for the new Sterling Highway between MP 45 and 60 in Cooper Landing, Alaska. This work will allow for geotechnical activities, drill rigging, and design access.

Contractor Information

Kiewit Infrastructure West Co.

DOT Number
907-595-2217
Project Area
24

Special Accommodations Contact:

Those people who reside in construction zones and may require special accommodations should call the DOT Highway Construction Engineer at 907-269-0450 (TTY 907-269-0473).

Safety in all construction zones:

  • Traffic fines are double
  • Watch for changing driving surfaces
  • Watch for reduced speed limits
  • Be alert to and follow directions of flaggers
  • Drive with headlights on
  • Allow additional time when traveling
  • Watch for equipment and workers