ROSIE CREEK ROAD IMPROVEMENTS ROAD CONSTRUCTION through the season
What You Need to Know
  • Early in the week of September 20, crews will be shaping and paving driveways on Rosie Creek Road. Be alert to traffic control and the direction of crews as the asphalt may be hot. Please communicate with onsite personnel for accommodations to enter and exit residences.
  • On Wednesday, September 22, crews will be striping from Chena Pump Road to Becker Ridge Road. Drivers should be aware of traffic control and wet paint.
  • Late in the week of September 20, crews will be removing and installing guardrail on Chena Pump Road. Drivers should expect flagging operations and minor DELAYS.
  • Please check message boards along Chena Pump Road for updated information.
Project End Result

The Alaska Department of Transportation, in collaboration with HC Contractors, is working to improve Rosie Creek Road with a new, smoother, wider driving surface, established shoulders, new drainage, and new safety features.

Contractor Information

HC Contractors

Contractor Number
907-488-5983
DOT Number
907-451-5461

Special Accommodations Contact:

Those people who reside in construction zones and may require special accommodations should call the DOT Highway Construction Engineer at 907-269-0450 (TTY 907-269-0473).

Safety in all construction zones:

  • Traffic fines are double
  • Watch for changing driving surfaces
  • Watch for reduced speed limits
  • Be alert to and follow directions of flaggers
  • Drive with headlights on
  • Allow additional time when traveling
  • Watch for equipment and workers