Skip to main content

map

map

LEGEND:

Project Marker Project

Project With Road Closure Project with

       ROAD CLOSURE

Back to projectsBack to Projects

Back to projectsBack to Projects

ROOSEVELT ROAD and FRANKLIN ROAD PAVEMENT REHABILITATION ROAD CONSTRUCTION through September
What You Need to Know
  • The week of August 21 will include removing and replacing mailboxes, removing and replacing signs, and shaping of driveway approaches in preparation for paving.
  • Please be alert to LANE RESTRICTIONS and DETOURS.
  • Expect delays up to 20 minutes during paving.
Project End Result

The Alaska Department of Transportation in partnership with SECON Construction are working to rehabilitate existing pavement on Franklin Road from South Tongass to Roosevelt Drive. Additionally, the Roosevelt Drive Spur from Teddy Lane to Roosevelt Drive, and Roosevelt Drive from Roosevelt Spur to South Tongass are also being rehabilitated. There will be spot culvert replacement, drainage improvements, mailbox installation, and guardrail replacements on this project as well.

Contractor Information

SECON

Contractor Number
907-225-6491

Special Accommodations Contact:

Those people who reside in construction zones and may require special accommodations should call the DOT Highway Construction Engineer at 907-269-0450 (TTY 907-269-0473).

Safety in all construction zones:

  • Traffic fines are double
  • Watch for changing driving surfaces
  • Watch for reduced speed limits
  • Be alert to and follow directions of flaggers
  • Drive with headlights on
  • Allow additional time when traveling
  • Watch for equipment and workers