ROCHE MOUTONNEE CREEK BRIDGE REPLACEMENT ROAD CONSTRUCTION through September
What You Need to Know
  • This project has been shut down for the winter. Construction will resume in the summer.

 

Traffic Impacts

Over the course of the season, be alert to flagging operations and DELAYS. Be alert to additional construction traffic around the Holden Creek material site and trucks hauling materials from the old detour onto the new roadway. Please follow all signs for the DETOUR route.

Project End Result

The Alaska Department of Transportation, in partnership with Tutka, LLC., is replacing the Roche Moutonnee Creek Bridge (#1519). Upon completion, the Roche Moutonnee Creek Bridge will have a wider driving surface area and a higher allowable load rating. This project is expected to be complete by the end of September 2017. 

Contractor Information
Tutka, LLC
Contractor Number
907-357-2238
DOT Number
907-451-5461
Public Files
P9230035.JPG

Special Accommodations Contact:

Those people who reside in construction zones and may require special accommodations should call the DOT Highway Construction Engineer at 907-269-0450 (TTY 907-269-0473).

Safety in all construction zones:

  • Traffic fines are double
  • Watch for changing driving surfaces
  • Watch for reduced speed limits
  • Be alert to and follow directions of flaggers
  • Drive with headlights on
  • Allow additional time when traveling
  • Watch for equipment and workers