Skip to main content

map

map

LEGEND:

Project Marker Project

Project With Road Closure Project with

       ROAD CLOSURE

Back to projectsBack to Projects

RICHARDSON HIGHWAY, VALDEZ GLACIER STREAM BRIDGE #556 and LOWE RIVER BRIDGE #558 ROAD CONSTRUCTION through September
What You Need to Know
  • Be alert to LANE RESTRICTIONS, temporary traffic signal operations, flagging operations, gravel roads and abrupt edges.
Project End Result

The Alaska Department of Transportation is working in cooperation with QAP to repair two bridges with new waterproofing membranes, expansion joints and paved surfaces. This project is scheduled to be complete by September 2017.

Contractor Information

QAP

Contractor Number
907-835-8056
DOT Number
907-835-8067

Special Accommodations Contact:

Those people who reside in construction zones and may require special accommodations should call the DOT Highway Construction Engineer at 907-269-0450 (TTY 907-269-0473).

Safety in all construction zones:

  • Traffic fines are double
  • Watch for changing driving surfaces
  • Watch for reduced speed limits
  • Be alert to and follow directions of flaggers
  • Drive with headlights on
  • Allow additional time when traveling
  • Watch for equipment and workers