RICHARDSON HIGHWAY, MP 80 to 82 RESURFACING and DRAINAGE ROAD CONSTRUCTION through September
What You Need to Know
  • Expect short DELAYS up to 10 minutes, PILOT CAR and flagging operations 24 hours a day, Monday through Saturday.
Traffic Impacts

Please be alert to LANE RESTRICTIONS and a 45 MPH speed limit throughout the construction zone Monday through Saturday 7:00am to 8:30pm.

Project End Result

The Department of Transportation, in cooperation with Harris Sand & Gravel, is working to resurface roadways, increase drainage, install new road signs and create pavement markers. This project is scheduled to be complete by the end of September 2017. 

Contractor Information

Harris Sand & Gravel

Contractor Number
907-835-4756

Special Accommodations Contact:

Those people who reside in construction zones and may require special accommodations should call the DOT Highway Construction Engineer at 907-269-0450 (TTY 907-269-0473).

Safety in all construction zones:

  • Traffic fines are double
  • Watch for changing driving surfaces
  • Watch for reduced speed limits
  • Be alert to and follow directions of flaggers
  • Drive with headlights on
  • Allow additional time when traveling
  • Watch for equipment and workers