RICHARDSON HIGHWAY MP 51 to 65 RESURFACING ROAD CONSTRUCTION through the season
What You Need to Know
  • Crews will be working between MP 51 and 65 from 6:00am to 8:00pm, Monday through Sunday.
  • Through Friday, June 12, drivers should expect paving operations beginning at MP 51.
  • Asphalt pavement crushing and grading operations will also continue throughout this period.
  • Expect double PILOT CAR and flagging operations with DELAYS up to 20 minutes, in addition to reduced speeds with double fines around work zones.
  • Please be aware of loose gravel and flying debris throughout the roadway.
Project End Result

The Alaska Department of Transportation, in cooperation with Great Northwest Inc., is working to resurface the Richardson Highway between MP 51 and 65. Work will include installing paving, signage and striping. Project work is expected to be complete in June 2020.

Contractor Information

Great Northwest Inc.

Contractor Number
907-822-5325
DOT Number
907-713-7111

Special Accommodations Contact:

Those people who reside in construction zones and may require special accommodations should call the DOT Highway Construction Engineer at 907-269-0450 (TTY 907-269-0473).

Safety in all construction zones:

  • Traffic fines are double
  • Watch for changing driving surfaces
  • Watch for reduced speed limits
  • Be alert to and follow directions of flaggers
  • Drive with headlights on
  • Allow additional time when traveling
  • Watch for equipment and workers