PARKS HIGHWAY, MP 83 to 99 IMPROVEMENTS ROAD CONSTRUCTION through September
What You Need to Know
  • Drivers should be alert to shoulder work.
  • Please be alert to traffic control, workers, and equipment from MP 90 to 99.
  • Downed trees from MP 90 to 99 can be taken for public personal use. Please park in safe areas, and stay clear of active work zones and equipment.
Project End Result

The Alaska Department of Transportation, in cooperation with QAP Construction, is working to complete Systemic Passing Lanes from MP 83 to 99, reconstruction of the existing highway from MP 90 to 99, and pedestrian access improvements at the Parks Highway and Talkeetna Spur Intersection. Work on this project is expected to be complete in September 2019.

Contractor Information

QAP

Contractor Number
907-376-9818
DOT Number
907-269-0450
DOT Hotline
907-733-6110

Special Accommodations Contact:

Those people who reside in construction zones and may require special accommodations should call the DOT Highway Construction Engineer at 907-269-0450 (TTY 907-269-0473).

Safety in all construction zones:

  • Traffic fines are double
  • Watch for changing driving surfaces
  • Watch for reduced speed limits
  • Be alert to and follow directions of flaggers
  • Drive with headlights on
  • Allow additional time when traveling