Skip to main content

map

map

LEGEND:

Project Marker Project

Project With Road Closure Project with

       ROAD CLOSURE

PARKS HIGHWAY, MP 163 to 174 REHABILITATION ROAD CONSTRUCTION through
What You Need to Know
  • Drivers should expect LANE CLOSURES, back-to-back PILOT CAR operations, and DELAYS up to 20 minutes between 6:00am and 7:00pm.
  • Drivers should be aware of rough roads, loose gravel, unpaved traffic diversions, a temporary traffic signal, and heavy equipment working on or near the roadway during all hours. 
  • Through Friday, September 25, from 6:00am to 9:00pm, please be aware of daily striping and rumble strip operations. 
Project End Result

The Alaska Department of Transportation, in cooperation with Great Northwest, is working to rehabilitate the Parks Highway between MP 163 and 174. 

Contractor Information

Great NorthWest

Special Accommodations Contact:

Those people who reside in construction zones and may require special accommodations should call the DOT Highway Construction Engineer at 907-269-0450 (TTY 907-269-0473).

Safety in all construction zones:

  • Traffic fines are double
  • Watch for changing driving surfaces
  • Watch for reduced speed limits
  • Be alert to and follow directions of flaggers
  • Drive with headlights on
  • Allow additional time when traveling
  • Watch for equipment and workers