ROAD CLOSURE: Access to Haugen Drive from Nordic Drive is CLOSED. Please use Gioa Street to 1st Street and follow construction signs for DETOUR routes. During this time, there will be NO PARKING on either side of Nordic Drive from South Harbor to Sing Lee Alley, and NO PARKING on either side of Nordic from Haugen Drive to Lumber Street. 

  • There is no work scheduled from Thursday, May 19 through Sunday, May 22.
  • Be alert to flagging operations and REDUCED SPEED LIMITS on Nordic Drive between Sing Lee Alley and Lumber Street from 6:00am to 12:00am. Please use caution when traveling through the project area.

Please reduce your speeds and be aware of pedestrians, construction workers and heavy equipment in and out of the traffic lanes. As always speeding fines are doubled in all construction areas. There will be flaggers posted to direct you through the zone safely.

Project End Result

The Alaska Department of Transportation is working with Secon to improve Haugen Drive and S Nordic Drive. Upon completion, there will be new sidewalks from Nordic Drive to 12th Street and from Haugen Drive to the Ferry Terminal along South Nordic Drive and a new pedestrian pathway from the Airport to Sandy Beach Road. This project is scheduled to be complete by September 2016.

More Information

Secon: Phone: 772-5026
DOT: Engineer Phone: 772-5030
Hotline: 209-2915

From the Project Engineer

During the upcoming closure of Birch Street next week for concrete work on Nordic, the Borough will allow affected residents to park in the following areas: - Along the 2nd Street shoulder (please keep clear of driveways, intersections, hydrants etc.) - Any daytime parking spots on Main Street not otherwise closed for construction, will be open to both daytime and overnight parking. - The Library parking lot may be utilized during hours that the Library is closed to the public. (Operating hours for the Library are Monday through Thursday, 11:00am to 8:00pm, and Friday and Saturday from 11:00am to 6:00pm, closed Sunday). Birch Street residents may use this parking area outside of these operating times. -The municipal building lot should NOT be used for parking, as contractors will be closing the area for work.

NORDIC DRIVE and HAUGEN DRIVE IMPROVEMENTS

ROAD CONSTRUCTION through July

Today's date is:

May 24, 2016

Last updated at: 8:49 May 24, 2016

Map Legend

map legend

Construction Areas Note

Those people who reside in construction zones and may require special accommodations should call the DOT Highway Construction Engineer at 907-269-0450 (TTY 907-269-0473).