MENDENHALL LOOP ROAD ROUNDABOUTS ROAD CONSTRUCTION through June
What You Need to Know
  • Crews are currently working on the construction of two roundabouts along Mendenhall Loop Road. Phase 1 of the project is beginning on the roundabout at Floyd Dryden Middle School.
  • During construction of the Floyd Dryden Middle School roundabout, traffic on the side roads will be stop-controlled, and left turns onto Mendenhall Loop Road will not be allowed from these side streets.
  • Drivers should follow the posted DETOUR ROUTES. Please expect temporary disruptions to the multi-use pathway. Pedestrians and bicyclists will need to use the project shuttle to navigate through the project area. 
Project End Result

The Alaska Department of Transportation, in cooperation with SECON, is working to construct two roundabouts along Mendenhall Loop Road. Work is expected to be complete by June 2020. 

Contractor Information

SECON

Contractor Number
907-523-5774
DOT Number
907-465-4503

Special Accommodations Contact:

Those people who reside in construction zones and may require special accommodations should call the DOT Highway Construction Engineer at 907-269-0450 (TTY 907-269-0473).

Safety in all construction zones:

  • Traffic fines are double
  • Watch for changing driving surfaces
  • Watch for reduced speed limits
  • Be alert to and follow directions of flaggers
  • Drive with headlights on
  • Allow additional time when traveling
  • Watch for equipment and workers