Skip to main content

map

map

LEGEND:

Project Marker Project

Project With Road Closure Project with

       ROAD CLOSURE

Back to projectsBack to Projects

KDK REZANOF DRIVE RESURFACING, AIRPORT to CHINIAK HIGHWAY ROAD CONSTRUCTION through August
What You Need to Know
  • Drivers should be alert to flagging operations along Rezanof Drive between West Marine Way and Carolyn Street from 8:00am to 5:00pm. Be aware of equipment entering and exiting the road way.
  • Please be aware of a rough pavement patch at Herr Creek on Rezanof Drive. Please use caution when traveling in this area.
  • Drivers should expect a SINGLE-LANE CLOSURE and PILOT CAR operations between 7:00am and 5:00pm. Please expect DELAYS up to 10 minutes. This is a cold pavement milling operation in preparation of the placement of new pavement. Please be alert to a grooved driving surface. Motorcycles must exercise extreme caution when driving on this surface. Drivers are not allowed to pass other vehicles in the grooved pavement area. Crews will progress slowly along Rezanof Drive, beginning at Sargent Creek and moving roughly one mile per day until the Buskin River Bridge.
Project End Result

The Alaska Department of Transportation, in cooperation with Brechan Construction, is performing paving operations along Rezanof Drive and the Chiniak Highway.

Contractor Information

Brechan Construction

Contractor Number
907-942-4402 & 907-717-3128

Special Accommodations Contact:

Those people who reside in construction zones and may require special accommodations should call the DOT Highway Construction Engineer at 907-269-0450 (TTY 907-269-0473).

Safety in all construction zones:

  • Traffic fines are double
  • Watch for changing driving surfaces
  • Watch for reduced speed limits
  • Be alert to and follow directions of flaggers
  • Drive with headlights on
  • Allow additional time when traveling
  • Watch for equipment and workers