Skip to main content

map

map

LEGEND:

Project Marker Project

Project With Road Closure Project with

       ROAD CLOSURE

JUNEAU, DOUGLAS HIGHWAY SURFACE and SIDEWALK REPAIRS, STAGE 1 ROAD CONSTRUCTION through the season
What You Need to Know
  • Starting Tuesday, July 27 at 8:00pm, crews will begin night work on the Douglas Highway, south of the roundabout. 
  • Beginning Tuesday, July 27 through Monday, August 2, on-street parking will not be available in the work area. 
  • Drivers should expect narrow lanes, shifting lanes, and flagging operations.
  • Pedestrians should be alert to sidewalk detours.
  • For more information, visit the project website at https://douglashwy.com/
Project End Result

The Alaska Department of Transportation, in cooperation with SECON, is working to resurface the Douglas Highway from the intersection of Douglas Highway and Egan Drive to Nome Street, including the Douglas Highway roundabout. Work will also include repairing or replacing sidewalk, curb and gutter, and curb ramps to achieve ADA compliance, as well as rehabilitating or replacing culverts to improve drainage.

 

Contractor Information

SECON

DOT Hotline
907-371-2024
Public Files

Special Accommodations Contact:

Those people who reside in construction zones and may require special accommodations should call the DOT Highway Construction Engineer at 907-269-0450 (TTY 907-269-0473).

Safety in all construction zones:

  • Traffic fines are double
  • Watch for changing driving surfaces
  • Watch for reduced speed limits
  • Be alert to and follow directions of flaggers
  • Drive with headlights on
  • Allow additional time when traveling
  • Watch for equipment and workers