HSIP: GLENN HIGHWAY MEDIAN BARRIER, MP 30 to 34 ROAD CONSTRUCTION through the season
What You Need to Know
  • This project is in winter shutdown. Work is expected to resume in Spring 2022.
Project End Result

The Alaska Department of Transportation, in cooperation with Granite Construction, will be working to construct a median barrier along the Glenn Highway from MP 30 to 34. Project work includes installation of a median crossover, drainage improvements, paving, and high tension cable guardrail.

Contractor Information

Granite Construction

DOT Number
907-746-3057

Special Accommodations Contact:

Those people who reside in construction zones and may require special accommodations should call the DOT Highway Construction Engineer at 907-269-0450 (TTY 907-269-0473).

Safety in all construction zones:

  • Traffic fines are double
  • Watch for changing driving surfaces
  • Watch for reduced speed limits
  • Be alert to and follow directions of flaggers
  • Drive with headlights on
  • Allow additional time when traveling
  • Watch for equipment and workers