HOMER, LAKE STREET REHABILITATION ROAD CONSTRUCTION through the season
What You Need to Know
  • Be alert to workers and equipment in the roadway, flagging operations, and DELAYS, seven days a week. Work will occur during daytime hours.
Project End Result

The Alaska Department of Transportation, in cooperation with Southcentral Construction Inc., is rehabilitating Lake Street in downtown Homer from the Sterling Highway to Pioneer Road. Project work includes excavation, drainage improvements, utility work, paving, signalization, signing and striping.

Contractor Information

Southcentral Construction Inc.

DOT Number
907-242-4889
Project Area
22

Special Accommodations Contact:

Those people who reside in construction zones and may require special accommodations should call the DOT Highway Construction Engineer at 907-269-0450 (TTY 907-269-0473).

Safety in all construction zones:

  • Traffic fines are double
  • Watch for changing driving surfaces
  • Watch for reduced speed limits
  • Be alert to and follow directions of flaggers
  • Drive with headlights on
  • Allow additional time when traveling
  • Watch for equipment and workers