GLENN HIGHWAY PREVENTATIVE MAINTENANCE ROAD CONSTRUCTION through July
What You Need to Know
  • Crews will be working 9:00am to 3:00pm, Monday through Saturday. This work is weather-dependent.
  • Drivers should expect daily LANE RESTRICTIONS on the Glenn Highway from Airport Heights Drive to the Hiland Overpass.
  • Crews will be completing northbound lanes first, then southbound lanes.
Project End Result

The Alaska Department of Transportation is working to seal cracks along the Glenn Highway from MP 0 to 10.

Project Area
8

Special Accommodations Contact:

Those people who reside in construction zones and may require special accommodations should call the DOT Highway Construction Engineer at 907-269-0450 (TTY 907-269-0473).

Safety in all construction zones:

  • Traffic fines are double
  • Watch for changing driving surfaces
  • Watch for reduced speed limits
  • Be alert to and follow directions of flaggers
  • Drive with headlights on
  • Allow additional time when traveling
  • Watch for equipment and workers