GLENN HIGHWAY MP 68.1 and MP 100 to 106, MAT-SU BOROUGH, SEPTEMBER 2012 FLOODING PERMANENT REPAIRS ROAD CONSTRUCTION through the season
What You Need to Know
  • Drivers should be alert to flagging operations and traffic control, Monday through Saturday, from 7:00am to 7:00pm.
  • Drivers should be aware of flagging and PILOT CAR operations, as well as trucks crossing onto the Glenn Highway at MP 106.
  • Please be alert to crews and equipment along the shoulder of the roadway.
Project End Result

The Alaska Department of Transportation, in cooperation with Granite Construction, is permanently repairing multiple sites along the Glenn Highway that were previously flood damaged. Project work includes resurfacing and realigning the road, and improving drainage and embankment protection.

Contractor Information

Granite Construction

Contractor Number
907-344-2593
DOT Number
907-269-0450
Project Area
13

Special Accommodations Contact:

Those people who reside in construction zones and may require special accommodations should call the DOT Highway Construction Engineer at 907-269-0450 (TTY 907-269-0473).

Safety in all construction zones:

  • Traffic fines are double
  • Watch for changing driving surfaces
  • Watch for reduced speed limits
  • Be alert to and follow directions of flaggers
  • Drive with headlights on
  • Allow additional time when traveling
  • Watch for equipment and workers