Other Projects

What You Need to Know

LANE CLOSURE: Be alert to nightly SINGLE-LANE TRAFFIC on the northbound Glenn Highway from Eagle River Loop Road (Hiland Exit) to Artillery Road between 9:00pm and 6:00am, seven days a week, through July. Please use caution when traveling through the project area.

PEDESTRIAN PATHWAY CLOSURE: The pedestrian pathway between Brooks Loop and Regency Drive is CLOSED through July. Please follow construction signs for DETOUR routes to Business Boulevard and Centerfield Drive.

  • No work is scheduled Friday, July 3 through Sunday, July 5 in observance of the Independence Day holiday.
  • Expect NEW TRAFFIC PATTERNS on the northbound and southbound Glenn Highway between Eagle River Loop Road (Hiland Exit) and Artillery Road, where lanes are shifted through mid-August. Please be aware of narrow shoulders and use caution when traveling through the project area.
  • Be alert to heavy equipment and construction workers in the roadway, 24 hours a day, Monday through Saturday.

Project End Result

The Alaska Department of Transportation is working with Kiewit Infrastructure West Co. to widen the Glenn Highway between Hiland Drive and Artillery Road. When the Glenn Highway Capacity Improvements project is complete, three lanes of the Glenn Highway will continue from Hiland Drive past the Artillary ramp. This project will only include the North Bound lane, which will place a new three lane bridge over Eagle River and convert the existing highway into a frontage road connecting Hiland with South Eagle River. This project is expected to be complete by December 2015.

More Information

DOT: Engineer Phone: 312-7966

GLENN HIGHWAY, EAGLE RIVER LOOP ROAD to ARTILLERY ROAD

ROAD CONSTRUCTION through the season

Today's date is:

July 3, 2015

Last updated at: 16:01 July 2, 2015

Map Legend

map legend

Construction Areas Note

Those people who reside in construction zones and may require special accommodations should call the DOT Highway Construction Engineer at 907-269-0450 (TTY 907-269-0473).