FAIRBANKS AREA CONCRETE BARRIER UPGRADE ROAD CONSTRUCTION through the season
What You Need to Know
  • Drivers should expect LANE CLOSURES in both northbound and southbound directions along the Richardson Highway.
  • Please drive with caution and be alert to work trucks entering and exiting traffic.
  • In the fall, drivers should expect intermittent LANE CLOSURES on Mitchell Expressway from Lathrop Street to the Richardson Highway on- and off-ramps.
Project End Result

The Alaska Department of Transportation, in cooperation with Exclusive Paving, is working at various locations throughout the Fairbanks and North Pole area. Work will include upgrading concrete barriers to current design standards on the Johansen Expressway, Mitchell Expressway, Steese Highway, and the Richardson Highway at North Pole. Work will occur during the 2020 and 2021 construction seasons. We will do our best to keep you informed of any project updates and appreciate your patience and cooperation during construction. This project is expected to be complete in August 2021.

Contractor Information

Exclusive Paving

Contractor Number
907-488-8833
DOT Number
907-451-5182
Public Files
Fairbanks-Area-Concrete-Barrier-Upgrade.pdf

Special Accommodations Contact:

Those people who reside in construction zones and may require special accommodations should call the DOT Highway Construction Engineer at 907-269-0450 (TTY 907-269-0473).

Safety in all construction zones:

  • Traffic fines are double
  • Watch for changing driving surfaces
  • Watch for reduced speed limits
  • Be alert to and follow directions of flaggers
  • Drive with headlights on
  • Allow additional time when traveling
  • Watch for equipment and workers