Skip to main content

map

map

LEGEND:

Project Marker Project

Project With Road Closure Project with

       ROAD CLOSURE

Back to projectsBack to Projects

ELLIOTT HIGHWAY MP 107.7 to 120.5 ROAD CONSTRUCTION through the season
What You Need to Know
  • Drivers should expect periodic LANE CLOSURES throughout August.
Traffic Impacts

Please be aware of minor DELAYS, reduced speeds and PILOT CAR and flagging operations.

Contractor Information

Wolverine Supply, INC

Contractor Number
907-373-6572
DOT Number
703-350-2880

Special Accommodations Contact:

Those people who reside in construction zones and may require special accommodations should call the DOT Highway Construction Engineer at 907-269-0450 (TTY 907-269-0473).

Safety in all construction zones:

  • Traffic fines are double
  • Watch for changing driving surfaces
  • Watch for reduced speed limits
  • Be alert to and follow directions of flaggers
  • Drive with headlights on
  • Allow additional time when traveling
  • Watch for equipment and workers