EDLUND ROAD ROAD CONSTRUCTION through the season
What You Need to Know
  • Through Wednesday, July 31, drivers should expect intermittent ONE-LANE TRAFFIC with flagging and PILOT CAR operations on Edlund Road and Fern Street.
Project End Result

The Alaska Department of Transportation, in cooperation with Pruhs Construction, is working to resurface Edlund Road and Fern Street from Edlund Road to Fairview Loop. Work will include installing a fish passage culvert at Cottonwood Creek, as well as dig-out operations, ditch grading, paving, guardrail, signing and striping.

Contractor Information

Pruhs Construction

Contractor Number
907-279-1020
DOT Number
907-746-9971

Special Accommodations Contact:

Those people who reside in construction zones and may require special accommodations should call the DOT Highway Construction Engineer at 907-269-0450 (TTY 907-269-0473).

Safety in all construction zones:

  • Traffic fines are double
  • Watch for changing driving surfaces
  • Watch for reduced speed limits
  • Be alert to and follow directions of flaggers
  • Drive with headlights on
  • Allow additional time when traveling
  • Watch for equipment and workers