Other Projects

What You Need to Know

  • Expect SINGLE-LANE TRAFFIC, flagging and PILOT CAR operations from 8:45am to 7:45pm, Friday, June 19 and from 7:30am to 8:00pm, Saturday, June 20.
  • At all other times, be alert to intermittent flagging operations from 8:45am to 7:45pm, Monday through Saturday.
  • Please be alert to construction workers and heavy equipment.
  • If you'd like to receive email updates for this project, please email [email protected].

Project End Result

 

When the Eagle River Road project is complete the roadway will be upgraded with widened shoulders, improved visibility, upgraded lighting, guardrail, mailboxes and signs.

More Information

Pruhs Construction Co., LLC: Phone: 279-1020
DOT: Engineer Phone: 622-5111

EAGLE RIVER ROAD REHABILITATION, UPPER TERRACE DRIVE to THE EAGLE RIVER NATURE CENTER

ROAD CONSTRUCTION through June

Today's date is:

June 17, 2015

Last updated at: 15:31 June 17, 2015

Map Legend

map legend

Construction Areas Note

Those people who reside in construction zones and may require special accommodations should call the DOT Highway Construction Engineer at 907-269-0450 (TTY 907-269-0473).