Skip to main content

map

map

LEGEND:

Project Marker Project

Project With Road Closure Project with

       ROAD CLOSURE

Back to projectsBack to Projects

Back to projectsBack to Projects

DOWLING ROAD, OLD SEWARD HIGHWAY to LAKE OTIS PARKWAY PAVEMENT PRESERVATION ROAD CONSTRUCTION through the season
What You Need to Know
  • Drivers should expect DELAYS due to LANE CLOSURES during the day and at night.
Project End Result

The Alaska Department of Transportation, in cooperation with GMG General Inc., is working to apply final traffic markings to Dowling Road between Old Seward Highway and Lake Otis Parkway.

Contractor Information

GMG General Inc.

DOT Number
907-770-0457

Special Accommodations Contact:

Those people who reside in construction zones and may require special accommodations should call the DOT Highway Construction Engineer at 907-269-0450 (TTY 907-269-0473).

Safety in all construction zones:

  • Traffic fines are double
  • Watch for changing driving surfaces
  • Watch for reduced speed limits
  • Be alert to and follow directions of flaggers
  • Drive with headlights on
  • Allow additional time when traveling
  • Watch for equipment and workers