DOWLING ROAD and SEWARD HIGHWAY INTERCHANGE RECONSTRUCTION ROAD CONSTRUCTION through the season
What You Need to Know
  • This project is in winter shutdown. Work is expected to resume in Spring 2023.
  • Through the winter, drivers should use the temporary ramps at the newly constructed roundabout.
  • Expected to occur in spring and summer of 2023, crews will be working on the remaining ramp reconstruction on all four corners, as well as additional paving and striping on the Dowling Road roundabouts and the Seward Highway.
Project End Result

The Alaska Department of Transportation, in cooperation with QAP, is working to reconstruct the Dowling Road and Seward Highway interchange. Project work includes expanding the Dowling Road roundabouts and replacing the Seward Highway overpass bridge at Dowling Road. Major project work is expected to be complete in the fall of 2022, with final work taking place throughout 2023.

Contractor Information

QAP

Contractor Number
907-522-2211
DOT Number
907-770-2612

Special Accommodations Contact:

Those people who reside in construction zones and may require special accommodations should call the DOT Highway Construction Engineer at 907-269-0450 (TTY 907-269-0473).

Safety in all construction zones:

  • Traffic fines are double
  • Watch for changing driving surfaces
  • Watch for reduced speed limits
  • Be alert to and follow directions of flaggers
  • Drive with headlights on
  • Allow additional time when traveling
  • Watch for equipment and workers