Skip to main content

map

map

LEGEND:

Project Marker Project

Project With Road Closure Project with

       ROAD CLOSURE

DENALI HIGHWAY MP 25, ROCK CREEK BRIDGE ROAD CONSTRUCTION through the season
What You Need to Know
  • Expected to occur on either Saturday, September 18 or Sunday, September 19, Rock Creek Bridge will open for SINGLE-LANE TRAFFIC.
  • Through Monday, September 20, drivers should expect SINGLE-LANE TRAFFIC and flagging operations.
  • Crews will be working between 6:00am and 6:00pm.
  • Drivers should be aware of trucks crossing between MP 17 and 25.
  • Drivers should also be aware of heavy equipment activity.
Project End Result

The Alaska Department of Transportation, in cooperation with Tutka, LLC, is working to replace the Rock Creek Bridge.

Contractor Information

Tutka, LLC

Contractor Number
907-357-2238
DOT Number
907-451-5375

Special Accommodations Contact:

Those people who reside in construction zones and may require special accommodations should call the DOT Highway Construction Engineer at 907-269-0450 (TTY 907-269-0473).

Safety in all construction zones:

  • Traffic fines are double
  • Watch for changing driving surfaces
  • Watch for reduced speed limits
  • Be alert to and follow directions of flaggers
  • Drive with headlights on
  • Allow additional time when traveling
  • Watch for equipment and workers