DALTON HIGHWAY, MP 397 to 414 RECONSTRUCTION ROAD CONSTRUCTION through the season
What You Need to Know
  • This project is complete. Construction crews are expected to be off the roadway by September 20. 
Traffic Impacts

Be alert to equipment in the roadway and please drive with caution throughout construction zones.

Project End Result

The Alaska Department of Transportation, in cooperation with Brice, Inc., is working to reconstruct the Dalton Highway, from MP 397 to MP 414. Upon completion, this section of the Dalton Highway will have sturdier embankment, as well as new culverts and fish passages. This project is expected to be complete in October 2017.

Contractor Information

Brice, Inc

Contractor Number
907-750-3458

Special Accommodations Contact:

Those people who reside in construction zones and may require special accommodations should call the DOT Highway Construction Engineer at 907-269-0450 (TTY 907-269-0473).

Safety in all construction zones:

  • Traffic fines are double
  • Watch for changing driving surfaces
  • Watch for reduced speed limits
  • Be alert to and follow directions of flaggers
  • Drive with headlights on
  • Allow additional time when traveling
  • Watch for equipment and workers