Skip to main content

map

map

LEGEND:

Project Marker Project

Project With Road Closure Project with

       ROAD CLOSURE

Back to projectsBack to Projects

DALTON HIGHWAY, MP 362 to 397 RECONSTRUCTION ROAD CONSTRUCTION through the season
What You Need to Know
  • Construction crews will be working long shifts Monday through Sunday 6:00am to 9:00pm. Drivers should expect DELAYS up to 30 minutes. 
  • Be alert to PILOT CAR operations from MP 362 to 370 and MP 379 to 390.
Traffic Impacts

Be alert to equipment in the roadway outside of PILOT CAR zones. Please observe a 45 MPH speed limit and drive with caution throughout construction zones. Expect slippery road conditions during surface application from MP 379 to 397. Motorcyclists use extreme caution on loose gravel surfaces.

Project End Result

The Alaska Department of Transportation, in cooperation with Cruz Construction, is working to raise grade to mitigate future potential flood damage, replace culverts and resurface the roadway. This project is expected to be complete in October 2018.

Contractor Information

Cruz Construction

Contractor Number
907-761-6606

Special Accommodations Contact:

Those people who reside in construction zones and may require special accommodations should call the DOT Highway Construction Engineer at 907-269-0450 (TTY 907-269-0473).

Safety in all construction zones:

  • Traffic fines are double
  • Watch for changing driving surfaces
  • Watch for reduced speed limits
  • Be alert to and follow directions of flaggers
  • Drive with headlights on
  • Allow additional time when traveling
  • Watch for equipment and workers