CUSHMAN STREET OVERCROSSING BRIDGE #1705 REPAIRS ROAD CONSTRUCTION through the season
What You Need to Know
  • The Mitchell Expressway as well as Cushman Street are now open.
Project End Result

The Alaska Department of Transportation, in cooperation with Swalling General Contractors, is working to repair the Cushman Street Overcrossing Bridge #1705. Project work includes the replacement of the outer three girders, including the bridge rail. 

Contractor Information

Swalling General Contractors

Contractor Number
907-272-3461
DOT Number
907-451-5137

Special Accommodations Contact:

Those people who reside in construction zones and may require special accommodations should call the DOT Highway Construction Engineer at 907-269-0450 (TTY 907-269-0473).

Safety in all construction zones:

  • Traffic fines are double
  • Watch for changing driving surfaces
  • Watch for reduced speed limits
  • Be alert to and follow directions of flaggers
  • Drive with headlights on
  • Allow additional time when traveling
  • Watch for equipment and workers