Skip to main content

map

map

LEGEND:

Project Marker Project

Project With Road Closure Project with

       ROAD CLOSURE

Back to projectsBack to Projects

Back to projectsBack to Projects

COLLEGE ROAD MEDIAN EXTENSION ROAD CONSTRUCTION through the season
What You Need to Know
  • Work on this project is complete.
Project End Result

The Alaska Department of Transportation, in cooperation with NPC Energy Services, is working to construct a new median on College Road from the Costco driveway to Illinois Street. Construction crews will also be installing roadside hardware, drainage and intersection improvements. The work zone extends from Crossover Way to Illinois Street. Work will also include demolition, excavation, paving, and concrete construction for the full width of College Road, curb to curb. This project is expected to be complete in December 2020.

Contractor Information

NPC Energy Services

Contractor Number
907-987-3559
DOT Number
907-451-5471

Special Accommodations Contact:

Those people who reside in construction zones and may require special accommodations should call the DOT Highway Construction Engineer at 907-269-0450 (TTY 907-269-0473).

Safety in all construction zones:

  • Traffic fines are double
  • Watch for changing driving surfaces
  • Watch for reduced speed limits
  • Be alert to and follow directions of flaggers
  • Drive with headlights on
  • Allow additional time when traveling
  • Watch for equipment and workers