CHICKEN AIRPORT ACCESS ROAD RESURFACING ROAD CONSTRUCTION through September
What You Need to Know
  • Work on this project is complete. Drivers should expect sweeping operations in approximately 2 weeks.
Project End Result

The Alaska Department of Transportation and Public Facilities, in cooperation with Drennon Construction, is working to resurface Chicken Airport Access Road from the intersection with the Taylor Highway to the airport property boundary with additional base course material and high float surface treatment. Project work also includes minor grading, clearing, drainage improvements and intersection improvements. The project is expected to be complete in September 2018.

Contractor Information

Drennon Construction

Contractor Number
907-457-7861

Special Accommodations Contact:

Those people who reside in construction zones and may require special accommodations should call the DOT Highway Construction Engineer at 907-269-0450 (TTY 907-269-0473).

Safety in all construction zones:

  • Traffic fines are double
  • Watch for changing driving surfaces
  • Watch for reduced speed limits
  • Be alert to and follow directions of flaggers
  • Drive with headlights on
  • Allow additional time when traveling
  • Watch for equipment and workers