Skip to main content

map

map

LEGEND:

Project Marker Project

Project With Road Closure Project with

       ROAD CLOSURE

ANCHORAGE DISTRICT, GROUP A – NOV 2018 EQ PR: OLD GLENN HIGHWAY, NORTH OF FISH HATCHERY ROAD ROAD CONSTRUCTION through the season
What You Need to Know
  • This project is in winter shutdown. Work is expected to resume in Spring 2022.
Project End Result

The Alaska Department of Transportation, in cooperation with Granite Construction, is working to make repairs due to damage from the November 2018 earthquake. Crews will be replacing a gabion wall north of Fish Hatchery Road and installing new drainage features behind it. This project is expected to be complete in October 2021.

Contractor Information

Granite Construction

Contractor Number
907-344-2593

Special Accommodations Contact:

Those people who reside in construction zones and may require special accommodations should call the DOT Highway Construction Engineer at 907-269-0450 (TTY 907-269-0473).

Safety in all construction zones:

  • Traffic fines are double
  • Watch for changing driving surfaces
  • Watch for reduced speed limits
  • Be alert to and follow directions of flaggers
  • Drive with headlights on
  • Allow additional time when traveling
  • Watch for equipment and workers