ANCHORAGE DISTRICT, GROUP B – NOV 2018 EQ PR: SEWARD HIGHWAY at DIMOND BOULEVARD, PAVEMENT REPAIR ROAD CONSTRUCTION through the season
What You Need to Know
  • This project is in winter shutdown. Work is expected to resume in spring 2023.
Project End Result

The Alaska Department of Transportation, in cooperation with Granite Construction, is working to make repairs due to damage from the November 2018 earthquake. Crews will be repairing pavement. This project is expected to be complete in August 2022.

Contractor Information

Granite Construction Company

Contractor Number
907-344-2593

Special Accommodations Contact:

Those people who reside in construction zones and may require special accommodations should call the DOT Highway Construction Engineer at 907-269-0450 (TTY 907-269-0473).

Safety in all construction zones:

  • Traffic fines are double
  • Watch for changing driving surfaces
  • Watch for reduced speed limits
  • Be alert to and follow directions of flaggers
  • Drive with headlights on
  • Allow additional time when traveling
  • Watch for equipment and workers