Other Projects

What You Need to Know

BRIDGE OPENING: The Aleknagik Wood River Bridge is now open to vehicle traffic. Drivers should use caution as work may continue on the roadway on both sides of Wood River as the project nears completion. Wood River marine traffic is RESTRICTED to the now permanent 172 foot wide by approximately 38 foot tall navigational opening under the new bridge.

Project End Result

The Alaska Department of Transportation is working with Mowat Construction to construct a bridge over Wood River to be completed on October 31, 2015. The bridge will be two lanes and will provide a 38-foot clearance above the river. Phase II of the Project also includes constructing a roadway connecting Lake Aleknagik Road to Peter Krause Sr. Drive on the north side of Aleknagik. The proposed roadway will be paved and have two 10-foot lanes with 5-foot shoulders, adding 2.5 additional miles of roadway on the north and south shores.

More Information

DOT: Engineer Phone: 842-1310

ALEKNAGIK WOOD RIVER BRIDGE

ROAD and BRIDGE CONSTRUCTION through the season

Today's date is:

March 20, 2016

Last updated at: 14:54 March 18, 2016

Map Legend

map legend

Construction Areas Note

Those people who reside in construction zones and may require special accommodations should call the DOT Highway Construction Engineer at 907-269-0450 (TTY 907-269-0473).