Skip to main content

map

map

LEGEND:

Project Marker Project

Project With Road Closure Project with

       ROAD CLOSURE

Back to projectsBack to Projects

AIRPORT WAY and JOHANSEN EXPRESSWAY, LED LIGHTING REPLACEMENT ROAD CONSTRUCTION through the season
What You Need to Know
  • Crews will be working during the day and at night on the shoulders of Airport Way and the Johansen Expressway to update the roadway lighting system.
  • Drivers should expect LANE CLOSURES.
  • Please watch for equipment accessing the light fixtures, especially at night.
Project End Result

The Alaska Department of Transportation, in cooperation with B & B Electric, Inc., is working to update the lighting on Airport Way and the Johansen Expressway. Upon completion of the work, drivers will notice improved lighting along these routes. The State will also realize a sizable cost savings due to reduced energy usage.

Contractor Information

B & B Electric, Inc.

Contractor Number
907-456-3225
DOT Number
907-451-2200

Special Accommodations Contact:

Those people who reside in construction zones and may require special accommodations should call the DOT Highway Construction Engineer at 907-269-0450 (TTY 907-269-0473).

Safety in all construction zones:

  • Traffic fines are double
  • Watch for changing driving surfaces
  • Watch for reduced speed limits
  • Be alert to and follow directions of flaggers
  • Drive with headlights on
  • Allow additional time when traveling
  • Watch for equipment and workers