Other Projects

What You Need to Know

  • Beginning 7:00pm Friday, September 23, be alert to night work between Lake Otis Parkway and Elmore due to paving operations. 
  • Be alert to LANE RESTRICTIONS at the Elmore Road and Abbott Road intersection, and the Lake Otis Parkway and Abbott Road intersection nightly between 7:00pm to 5:00am, and daily from 9:00am to 4:00pm.
  • Be alert to curb, gutter and utility relocation work near the Abbott Road and Elmore Road intersection.
  • If you would like to receive email updates for this project, please email [email protected].

Project End Result

The Alaska Department of Transportation is working with QAP to rehabilitate Abbott Road. Upon completion, this project will improve the existing pathway from Lake Otis Parkway to Jupiter Drive, provide a new two-way left turn lane, add a second eastbound thru lane at Lake Otis Parkway, and make improvements to drainage, paving, signage, striping and signalization. This project is scheduled to be complete by November 2016.

More Information

QAP: Phone: 522-2211
DOT: Engineer Phone: 644-0431

ABBOTT ROAD, LAKE OTIS PARKWAY to JUPITER DRIVE, REHABILITATION

ROAD CONSTRUCTION through November

Today's date is:

September 25, 2016

Last updated at: 14:56 September 23, 2016

Map Legend

map legend

Construction Areas Note

Those people who reside in construction zones and may require special accommodations should call the DOT Highway Construction Engineer at 907-269-0450 (TTY 907-269-0473).