Skip to main content

map

map

LEGEND:

Project Marker Project

Project With Road Closure Project with

       ROAD CLOSURE

Back to projectsBack to Projects

Back to projectsBack to Projects

13. HSIP: STERLING HIGHWAY SHOULDER WIDENING MP 97 to 118 ROAD CONSTRUCTION through November
What You Need to Know
  • Between 7:00am and 7:00pm, crews will be doing environmental maintenance and cleanup in the work area.
  • Throughout the summer, drivers should be aware of crews working along the shoulder and water truck activities.
  • Please be aware of construction vehicles, follow all posted signage, and be extra careful when driving at night in the project area as a high number of moose have been sighted along the project corridor.
Project End Result

The Alaska Department of Transportation is working to widen the highway shoulders and install four large diameter culverts. Construction for the 2019 season will primarily occur at Slikok Tributary, Crooked Creek, and Clam Gulch. The Coal Creek culvert will be replaced as a part of improvements, and the adjacent areas revegetated and restored. Construction work includes pavement removal, unclassified excavation, embankment, grading, paving, stream diversions, stream channel construction, stream bank construction, culvert installation, signing, and striping. This project is scheduled to be completed in summer 2020.

DOT Hotline
907-262-1042

Special Accommodations Contact:

Those people who reside in construction zones and may require special accommodations should call the DOT Highway Construction Engineer at 907-269-0450 (TTY 907-269-0473).

Safety in all construction zones:

  • Traffic fines are double
  • Watch for changing driving surfaces
  • Watch for reduced speed limits
  • Be alert to and follow directions of flaggers
  • Drive with headlights on
  • Allow additional time when traveling
  • Watch for equipment and workers