Skip to main content

map

map

LEGEND:

Project Marker Project

Project With Road Closure Project with

       ROAD CLOSURE

Back to projectsBack to Projects

Back to projectsBack to Projects

11. STERLING HIGHWAY REHABILITATION, SKILAK LAKE to STERLING ROAD CONSTRUCTION through the season
What You Need to Know
  • Work is complete on the Sterling Highway between MP 58 and 79. 
  • Drivers should be aware of crews performing daily watering of the grass seed from MP 65 to 58.
Project End Result

The Alaska Department of Transportation, in cooperation with Granite Construction, is working to improve road conditions on the Sterling Highway from MP 58 to 79. Work will include upgrading passing lanes and pedestrian walkways for Skyline Trail access, as well as road resurfacing and shoulder widening. Crews will also be replacing the existing culvert at the East Fork Moose River with a new bridge.

Contractor Information

Granite Construction

Contractor Number
907-344-2593
DOT Number
907-260-3089
DOT Hotline
1-833-206-4717

Special Accommodations Contact:

Those people who reside in construction zones and may require special accommodations should call the DOT Highway Construction Engineer at 907-269-0450 (TTY 907-269-0473).

Safety in all construction zones:

  • Traffic fines are double
  • Watch for changing driving surfaces
  • Watch for reduced speed limits
  • Be alert to and follow directions of flaggers
  • Drive with headlights on
  • Allow additional time when traveling
  • Watch for equipment and workers