Skip to main content

map

map

LEGEND:

Project Marker Project

Project With Road Closure Project with

       ROAD CLOSURE

10. AMATS: POST ROAD, 3RD AVENUE to REEVE BOULEVARD ROAD CONSTRUCTION through the season
What You Need to Know
  • Crews are performing milling and paving operations along Post Road between 3rd Avenue and Reeve Boulevard. Please drive with caution. 
  • Through Sunday, July 12, drivers should be aware of LANE RESTRICTIONS along Post Road and 3rd Avenue between 8:00pm and 5:30am. Please follow posted DETOUR ROUTES.
Project End Result

The Alaska Department of Transportation, in cooperation with Granite Construction Company, is milling and paving Post Road. 

Contractor Information

Granite Construction Company

Contractor Number
907-344-2593
DOT Number
907-269-0450

Special Accommodations Contact:

Those people who reside in construction zones and may require special accommodations should call the DOT Highway Construction Engineer at 907-269-0450 (TTY 907-269-0473).

Safety in all construction zones:

  • Traffic fines are double
  • Watch for changing driving surfaces
  • Watch for reduced speed limits
  • Be alert to and follow directions of flaggers
  • Drive with headlights on
  • Allow additional time when traveling
  • Watch for equipment and workers