- Work is expected to begin in September 2020.
- Crews will be working at night and during the day to install curb ramps and concrete, as well as perform sidewalk demolition.
The Alaska Department of Transportation, in cooperation with Granite Construction, is working to resurface Fireweed Lane from North Star Street to the Seward Highway. Project work will include installing paving, signing, striping, signal interconnect and curb ramps.
Granite Construction