05. HSIP: PALMER-WASILLA HIGHWAY, CENTER LEFT-TURN LANE WIDENING ROAD CONSTRUCTION through the season
What You Need to Know
  • Mainline striping in Phase I is complete. Drivers should be alert to water trucks as they water seeded slopes, as well as crews working on punchlist items.
  • Crews are working on pathway and approach paving in Phase III. Crews are working on guardrails at night, in addition to the installation of signs and stabilizaton of slopes with topsoil and seeding.
  • Mainline paving in Phase III is complete. Crews are still working on pathway asphalt and some approaches.
  • Please expect varying traffic patterns as paving and striping progresses throughout the project.
  • Be aware of crews working, as well as trucks and equipment operating in the project area.
  • Crews are striping at the Seward Meridian and working their way towards Palmer. Please be aware of wet paint and obey traffic control and flaggers when crews are working.
Project End Result

The Alaska Department of Transportation, in cooperation with QAP, is working to widen the Palmer-Wasilla Highway to create a two-way center left-turn only lane. Project work includes grading, drainage, paving, pathway, signing and striping.

Contractor Information

QAP

Contractor Number
907-746-0811
DOT Number
907-373-9532

Special Accommodations Contact:

Those people who reside in construction zones and may require special accommodations should call the DOT Highway Construction Engineer at 907-269-0450 (TTY 907-269-0473).

Safety in all construction zones:

  • Traffic fines are double
  • Watch for changing driving surfaces
  • Watch for reduced speed limits
  • Be alert to and follow directions of flaggers
  • Drive with headlights on
  • Allow additional time when traveling
  • Watch for equipment and workers