Skip to main content

map

map

LEGEND:

Project Marker Project

Project With Road Closure Project with

       ROAD CLOSURE

Back to projectsBack to Projects

01. PARKS HIGHWAY, MP 123.5 to 163 SYSTEMATIC PASSING LANES ROAD CONSTRUCTION through the season
What You Need to Know
  • Drivers should expect PILOT CAR and flagging operations between MP 156 and 163.
Project End Result

The Alaska Department of Transportation, in cooperation with QAP, is working to improve the Parks Highway by constructing eight passing lanes periodically from MP 123.5 to 163. Work will include clearing, grubbing, widening lanes and replacing culverts.

Contractor Information

QAP

Contractor Number
907-522-2211
DOT Number
907-269-0450

Special Accommodations Contact:

Those people who reside in construction zones and may require special accommodations should call the DOT Highway Construction Engineer at 907-269-0450 (TTY 907-269-0473).

Safety in all construction zones:

  • Traffic fines are double
  • Watch for changing driving surfaces
  • Watch for reduced speed limits
  • Be alert to and follow directions of flaggers
  • Drive with headlights on
  • Allow additional time when traveling
  • Watch for equipment and workers