Other Projects

What You Need to Know

  • Be alert to construction crews working in the area and slow moving construction vehicles between MP 193.5 and MP 195.3, Monday through Saturday, from 7:00am to 5:30pm. 
  • Expect a reduced speed limit of 55MPH between MP 193.5 and MP 195.3.
  • Winter weather conditions are still prevalent in the Cantwell area. Please drive safely and at a speed appropriate for conditions. 

Traffic Impacts

Over the course of the summer, be alert to construction workers on the shoulder, trucks crossing the roadway, and double fines between MP 193 and MP 195.

Project End Result

The Alaska Department of Transportation, in cooperation with QAP, is working to reconstruct approximately 1 mile of the Parks Highway between MP 193 and MP 195, construct a railroad overpass, and a new bridge across the middle fork of the Chulitna River.

More Information

QAP: Phone: 768-2705
DOT: Engineer Phone: 451-3018

PARKS HIGHWAY, MP 194 BROAD PASS RAILROAD OVERCROSSING

ROAD CONSTRUCTION through the season

Today's date is:

May 3, 2015

Last updated at: 16:17 May 1, 2015

Map Legend

map legend

Construction Areas Note

Those people who reside in construction zones and may require special accommodations should call the DOT Highway Construction Engineer at 907-269-0450 (TTY 907-269-0473).