  • Be alert to intermittente LANE RESTRICTIONS along the Old Seward Highway due to topsoil and seeding work.

Project End Result

The Alaska Department of Transportation is working with Granite Construction to preserve the Old Seward Highway between O'Malley Road and Dimond Boulevard. Upon completion this project will resurface the Old Seward Highway from O'Malley Road to Dimond Boulevard and will include, as necessary, improvements to pedestrian curb ramps, guardrail, guardrail end treatments, dig-outs, drainage repair, sign replacement, and replacement of striping.This project is scheduled to be complete by June 2016.

More Information

DOT: Engineer Phone: 344-5002

OLD SEWARD HIGHWAY, O'MALLEY ROAD to DIMOND BOULEVARD

ROAD CONSTRUCTION through June

Today's date is:

May 17, 2016

Last updated at: 22:32 May 17, 2016

Map Legend

map legend

Construction Areas Note

Those people who reside in construction zones and may require special accommodations should call the DOT Highway Construction Engineer at 907-269-0450 (TTY 907-269-0473).