PARKS HIGHWAY, CHURCH ROAD to PITTMAN ROAD ROAD CONSTRUCTION through the season
What You Need to Know
  • Parks Highway is now a four lane divided highway and speed limit of 55 MPH is reinstated.
  • The new railroad overpass at MP 46.5 is OPEN.
  • This project has been shut down for the winter. Construction will resume in the spring to complete paving and final striping.
Project End Result

The Alaska Department of Transportation is working with Knik Construction to upgrade the Parks Highway. Upon completion, the Parks Highway, between MP 44.5 to 48.8, will be reconstructed from a two-lane highway to a four-lane divided highway, a new bridge will be installed at MP 46.5, continuous lighting and new signals will be installed at Church Road, Stanley Road, Vine Road and Pittman Road. This project is scheduled to be complete by July 2018.

Contractor Information

Knik Construction

Contractor Number
907-631-3580
DOT Number
907-373-0061
DOT Hotline
907-373-0061

Special Accommodations Contact:

Those people who reside in construction zones and may require special accommodations should call the DOT Highway Construction Engineer at 907-269-0450 (TTY 907-269-0473).

Safety in all construction zones:

  • Traffic fines are double
  • Watch for changing driving surfaces
  • Watch for reduced speed limits
  • Be alert to and follow directions of flaggers
  • Drive with headlights on
  • Allow additional time when traveling