KALIFORNSKY BEACH ROAD MP 16 to 22.2, RESURFACING and SIGNALIZATION ROAD CONSTRUCTION through the season
What You Need to Know
  • Drivers should expect SINGLE LANE CLOSURES, multiple flagging operations and temporary approach CLOSURES between 8:00pm and 6:30am.

  • Off-road vehicles should be aware of construction crews and construction activities by the ATV trail.

  • Traffic signals are on a timer, drivers should be aware of changed traffic patterns.

Traffic Impacts

Drivers should be aware of REDUCED traffic lanes, PILOT CAR and flagging operations and short DELAYS after 8:00pm. Please be cautious of construction equipment and personnel in the area and follow all posted signs in the area. There will be NEW TRAFFIC PATTERNS at the new signal locations at Gaswell Road and Ciechanski Road.

Project End Result

The Alaska Department of Transportation, in cooperation with Knik Construction Company, is working to install two new signal systems at Gaswell Road and Ciechanski Road, as well as updating the signals at Bridge Access and Poppy Lane. The roadway will also be resurfaced, striped and new signs will be installed. Upon project completion, speed limits in the area will remain the same.

Contractor Information

Knik Construction Co.

Contractor Number
907-262-9140
DOT Number
907-283-1401

Special Accommodations Contact:

Those people who reside in construction zones and may require special accommodations should call the DOT Highway Construction Engineer at 907-269-0450 (TTY 907-269-0473).

Safety in all construction zones:

  • Traffic fines are double
  • Watch for changing driving surfaces
  • Watch for reduced speed limits
  • Be alert to and follow directions of flaggers
  • Drive with headlights on
  • Allow additional time when traveling