Skip to main content

map

map

LEGEND:

Project Marker Project

Project With Road Closure Project with

       ROAD CLOSURE

FMATS AREA SURFACE UPGRADES 2018 & FMATS IMPROVEMENTS ROAD CONSTRUCTION through mid September
What You Need to Know
  • In observance of Memorial Day, no work is expected on Monday, May 28. Work will resume Tuesday, May 29. 
  • Be alert to occasional LANE CLOSURES and follow signs for DETOUR routes.
Traffic Impacts

Drivers should expect minimal impacts to traffic during this time.

Project End Result

The Alaska Department of Transportation is working to resurface roads and replace curb ramps at multiple locations throughout the FMATS boundary, in both Fairbanks and North Pole. We will do our best to keep you informed as work progresses and appreciate your patience and cooperation during construction. This project is expected to be complete in mid-September 2018.

DOT Number
907-451-2797

Special Accommodations Contact:

Those people who reside in construction zones and may require special accommodations should call the DOT Highway Construction Engineer at 907-269-0450 (TTY 907-269-0473).

Safety in all construction zones:

  • Traffic fines are double
  • Watch for changing driving surfaces
  • Watch for reduced speed limits
  • Be alert to and follow directions of flaggers
  • Drive with headlights on
  • Allow additional time when traveling
  • Watch for equipment and workers