FARMERS LOOP ROAD RECONSTRUCTION ROAD CONSTRUCTION through October
What You Need to Know
  • This project has been shut down for the winter. Construction will resume in the spring.
Project End Result

The Alaska Department of Transportation is working in cooperation with Exclusive Paving to freshly pave street surfaces, improve lighting, traffic signals and drainage. This project is scheduled to be complete by October 2017. Work on Farmers Loop for the 2017 season includes installing a signal interconnect system from College Road/University Avenue intersection to Ballaine Road intersection, and resurface Farmers Loop and adjoining bike path from College Road/University Avenue intersection to Ballaine Road intersection.  The 2018 construction season will see the complete resurfacing of Farmers Loop and bike path from Ballaine Road intersection to Steese Highway.

Contractor Information

Exclusive Paving

Contractor Number
907-322-2226

Special Accommodations Contact:

Those people who reside in construction zones and may require special accommodations should call the DOT Highway Construction Engineer at 907-269-0450 (TTY 907-269-0473).

Safety in all construction zones:

  • Traffic fines are double
  • Watch for changing driving surfaces
  • Watch for reduced speed limits
  • Be alert to and follow directions of flaggers
  • Drive with headlights on
  • Allow additional time when traveling
  • Watch for equipment and workers