Skip to main content

map

map

LEGEND:

Project Marker Project

Project With Road Closure Project with

       ROAD CLOSURE

ELLIOTT HIGHWAY, MP 107.7 to 120.5 ROAD CONSTRUCTION through the season
Road Closure
  • Expect periodic lane CLOSURES through May, June and July.
What You Need to Know
  • Resurfacing the Elliott Highway from MP 107.7 to 120.5.
  • Expect minor delays.
  • Drivers should reduce speeds in the area and be alert to flagger and pilot car operations.
Contractor Information

Wolverine Supply, INC

Contractor Number
907-373-6572
DOT Number
TBA
DOT Hotline
703-350-2880

Special Accommodations Contact:

Those people who reside in construction zones and may require special accommodations should call the DOT Highway Construction Engineer at 907-269-0450 (TTY 907-269-0473).

Safety in all construction zones:

  • Traffic fines are double
  • Watch for changing driving surfaces
  • Watch for reduced speed limits
  • Be alert to and follow directions of flaggers
  • Drive with headlights on
  • Allow additional time when traveling
  • Watch for equipment and workers